Prepare the payroll
- List the required fringe separately from the prevailing cash base.
- Apply eligible plan credit up to the required rate for purposes of this worksheet.
- Calculate the remaining cash fringe and reconcile it to an earnings line before payroll approval.
Worked example
A $15 fringe rate with $11.80 plan credit leaves $3.20 per hour. A 38.25-hour week requires $122.40 in cash fringe.