All public-works payroll guides

Wage Determination Classification Rate Worksheet

Build a reusable rate schedule using the determination incorporated into your public-works contract.

Prepare the payroll

  1. Record the determination identifier and revision with the payroll.
  2. Make one rate entry per classification. Enter basic rates and fringe as separate figures.
  3. Confirm the assigned classification against actual work. Escalate missing classifications through the applicable process.

Worked example

A $46.85 base and $18.90 fringe become 4685 and 1890 cents in the workbench. Preserve the source page with the schedule.

Open the payroll workbench

Common questions

Can I use a rate from a different project?

Verify the determination and revision incorporated into the contract for the actual work.